As I said in my last blog, I wanted to post some progress pictures from the bathroom remodel that is going on in Elmhurst (a Chicago suburb). I’ll keep this short since I just blogged yesterday.

View looking towards the master closet wall

View looking towards the master closet door

Tile shower- grouting in process (linen closet doors to the right)

Tile shower- grouting in process

Vanity wall- framed out for medicine cabinets

After the second coat of paint is complete and the shower is grouted, the vanity will be set. After the vanity is set the plumber will come back to install the fixtures and the electrician will be back to hang the lighting fixtures. This is one of my favorite stages of a project, things will come together very fast this week! My site visit today reminded me of why I love what I do. It is so great to see the vision that I have had of this space for weeks now, turning into a reality. Keep posted for the final after pics.

2 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *

@ 2019 Lugbill Designs   Downtown 211 W Wacker Dr, Suite 300, Chicago, IL 60606   North Side 7005 North Glenwood Avenue, Chicago, IL 60626-2812    (773) 572-9049